interruption due to Repair of Existing 150mmØ Pipelines at Purok Pag-Asa, Barangay Paraiso, City of Koronadal
Supply and Delivery of Four Hundred Eighty-Nine (489) Drums Sodium Hypochlorite (Content Only) / Supply and Delivery of Various Brass Water Meter / Supply and Delivery of Service Connection Materials for 2024
Download Document(s): Schedule A Schedule B Addendum Schedule C Addendum
Relocation of Pipelines affected by canal project and Installation of Isolation Valve 150mmØ at entire Barangay San Isidro, City of Koronadal.
Interconnection of pipes at , Purok Santo Niño and Purok Mesias, Barangay Paraiso
Supply, Delivery and Commissioning of Various Laboratory Equipment with Materials and Consumables / Supply, Delivery and Fabrication of Office Tables and Individual Mobile Cabinet / Supply and Delivery of One (1) Unit Brand New Pick up Vehicle / Provision of Services for Geotechnical Analysis with Structural Design of Glass Fused-to-Steel Bolted Tank Foundation
Download Documents: Schedule A Schedule B Schedule C Schedule D
Water Interruption due to restoration of pipes at PS 2 (Forro Pumping Station), Purok M. Forro, Barangay GPS,Koronadal City
Water Interruption due to Interconnection Works at Agreville Phase 2, Brgy. Sto. Niño
Interconnection Works at Purok Twin River East & Purok Riverside , Brgy. Sto. Nino
Supply and Delivery of Various Painting Materials / Delivery, Installation and Commissioning of Interactive Touchscreen / Supply and Delivery of Forty One (41) Bottle of OTO Solution, 240ml and Fifty Four (54) Set of Residual Kit (Sodium Hypochlorite)
Download Documents Schedule A Terms of Reference Schedule B Terms of Reference Schedule C Terms of Reference
Supply, Delivery, Installation and Commissioning of One (1) Unit Fabricated Panel Bolted Water Tank
Download Document Schedule A